day 90 February 28, 2017 JimwoodworkingLeave a comment A pretty productive day. Finished the bed, added the bracing for the bed and rear skin. And installed the second to last piece of the inner ceiling.
day 89 February 27, 2017 Jimbed, woodworkingLeave a comment We almost have a bed. Just need to make some supports for the back, then it will be time to seal it up.
day 88 February 25, 2017 JimwoodworkingLeave a comment Made the side of the bed today. Here is my other helper (not so much), she finds the garage to be big torture.
day — February 22, 2017 JimLeave a comment Didn’t really work on it today, one has to do yard work once in a while. I did nail up the molding I made yesterday for covering the plywood seams just to see how it looks.
day 86 February 21, 2017 JimwoodworkingLeave a comment Finished the drawers today. Cabinets are all done. Still need to make a backsplash, plumb the sink, and plumb the faucet.
days 84 & 85 February 20, 2017February 20, 2017 JimBoston Terrier, Buster, woodworkingLeave a comment Got the prototype drawer done, may use it may make another. I lost my building partner yesterday so I’ve been slowed down a bit.
day 83 February 18, 2017 JimwoodworkingLeave a comment Leftovers A few leftovers, some glue, and some machineing results in some drawer fronts.
day 82 February 16, 2017 Jimelectrical, wiringLeave a comment Worked on adding some conduit for the brakes and tail lights. Hope the taillight wires will fit, the brake wires are in.